I explain how to choose the right m³/h concrete trailer pump for 500 m³/week foundation work in Medan, with practical capacity tips and reliable AIMIX local support.

I often meet customers in Medan who want to speed up their house foundation casting. Many of them feel unsure about the right concrete trailer pump size. If the pump is too small, the project slows down. If it is too large, the cost becomes unnecessary. In this post, I share how I guide customers to choose the right m³/h capacity for a weekly output of 500 m³. My goal is to help you make a confident and cost-effective decision.

Before you choose any pump capacity, you need to understand the rhythm of your casting plan. A weekly demand of 500 m³ already tells me that your project moves at a steady pace. However, you still need to break this number down by working days. Most contractors in Medan pour concrete four to six days each week. Therefore, this weekly target directly affects the daily pumping load.
Since this daily breakdown gives us a clearer picture, it naturally leads to the next question: how much concrete do you actually need to pump each day?
Once we divide 500 m³ across the week, the volume becomes easier to plan. For example, if you cast concrete five days a week, you handle around 100 m³ each day. If you work four days per week, the daily requirement rises to 125 m³. This daily goal helps you understand how fast the trailer concrete pump needs to deliver concrete. A stable and continuous output reduces labor waiting time and avoids cold joints. In house foundation work, this is especially important because the structure depends on uniform quality.
Because the daily requirement shapes the pumping performance, we can now look at the m³/h capacity that fits these needs.

For house foundation projects in Medan, most customers choose pumps in the 30–50 m³/h range. These models deliver concrete at a stable speed without wasting fuel or manpower. If your goal is 100 m³ per day, a 30–40 m³/h concrete trailer pump works well as long as your casting window lasts 3–4 hours. If you need about 125 m³ daily, you may prefer a 40–50 m³/h concrete pump stationary to keep the schedule smooth.
I also remind customers that casting conditions affect the actual output. The pipeline length, concrete slump, site layout, and crew coordination all influence pumping speed. Because these real-world factors play such a big role, I usually recommend choosing one level higher than the minimum requirement. This ensures fewer delays and gives your team more flexibility.
Now that we understand the pump capacity needed, let’s look at how the casting window and manpower shape the final decision.

Foundation casting in Medan often happens within a limited time window. Many contractors prefer to cast early in the morning because of weather and traffic. A short casting window increases the need for a pump with higher hourly output. For example, if you want to finish 100 m³ within three hours, you need at least 35 m³/h of real pumping output. This means choosing a 40 m³/h or 50 m³/h model for better safety margin.
Your team setup also matters. A skilled crew keeps the pipeline clean, controls slump, and coordinates trucks better. When the team works efficiently, the pump maintains stable pressure and speed. Therefore, the right pump capacity depends not only on the machine itself but also on how well your crew supports it.
Once you align the casting window and manpower, it becomes easier to choose a concrete pump that fits your pace and budget.
Based on most customer cases in Medan, the 40–50 m³/h concrete trailer pump fits a 500 m³ weekly foundation schedule best. This range offers enough speed, flexibility, and stability for houses, small buildings, and residential clusters. You complete your daily 100–125 m³ target without pushing the equipment too hard. You also reduce downtime and avoid delays that increase labor and mixer truck costs.
With the recommended capacity clear, you may now wonder which supplier can offer reliable models and strong local support.

I work with many customers across Medan, Binjai, and the surrounding areas. Many choose AIMIX because the pumps deliver stable performance and low maintenance costs. I like that we keep parts in stock and send engineers from our Indonesian team when customers need on-site support. When you combine the right pump capacity with reliable after-sales service, your project runs smoother and faster.
If you want to choose the right concrete trailer pump for your 500 m³ weekly foundation work, I can help you evaluate your site, your casting schedule, and your real pumping need. Click the button below or message me to get a tailored recommendation for your project.